BIM Manager

El Camino Behavioural Health Center

Behavioural health center built to adjacent active hospital facility. Utilities coordinated: Mechanical, Electrical, Plumbing, Fire Sprinkler, Pneumatic Tube, Security/Alarm.
  Project hat stringent requirements due to intended use for space.

Research Center for Confidential Client in Palo Alto

Research and innovation center for major car manufacturer.
Trades coordinated: Mechanical, Electrical, Plumbing & Fire Sprinkler.  This coordination required extensive communication with architect / design team to attain alignment between desired aesthetics and programming needs of client.  Coordination challenges included light panel ceiling in auditorium.

5110 Telegraph

Led effort to build/digitally assemble and verifiy placement of all critical elements with no drawings.  Generated CAD files for all survey.  Surveyed structural members with Leica TS-16 to observe deformation of beam camber. 

[ope_shortcode_placeholder]

KAISER SOUTH SAN FRANCISCO GENERATOR REPLACEMENT

Coordination of utilities to and from a new emergency back up generator in an active hospital. Generator replaced an existing generator without interruption of service to hospital. Rebar mat modeled to coordinate placement of seismic anchors in concrete pad.

Design Tech High School at Oracle

Award winning educational facility on Oracle campus.

Trades coordinated: Mechanical, Electric, Plumbing, Fire Sprinkler, Security (owner vendor).
ENR: Best K-12 Education: Design Tech High School
AIA -SanMateo: Design Tech High School to Be Honored for Sustainability

Gallery not found.

Kaiser Scotts Valley

Tenant improvement to convert spaces in an active office building to build medical offices and exam rooms